The facts

Title:   Stryker UK Headquarters
Client:   Stryker UK
Location:   Newbury, Berkshire
Services:    Architecture, Interiors & Landscape (provided by ESA, part of Capita Symonds)
Sector:    Offices/Healthcare
Contract Type:   JCT D&B
Project Value:    £15m
Start / Completion:     2008-2011

The project

Stryker is a global leader in medical technology providing specialist orthopaedic and surgical equipment to healthcare professionals across the world including the NHS. Stryker (UK) Limited is a long-standing Berkshire based company, currently employing around 200 people on site at Newbury (just across the road from the famous racecourse).

Stryker’s previous building was a combination of offices and logistics space extending to around 4,650sqm of floor area in a 25 year old facility which was not suited to the company’s needs and aspirations. The new building provides adequate office floor space for current and future needs as well as doubling the size of the company’s all-important logistics facility, while also creating a building of quality that visually expresses the company’s corporate intentions.

The new building is to the east of Newbury and is well connected via main line rail to London and the west of England. The building will continue Stryker’s long-standing relationship Newbury as one of the town’s major employers. 

The new 10,000sqm facility rises to three storeys and is organised around two internal atria that focus the public facilities of reception, exhibition space and the new 100-cover first floor restaurant for staff and visitors. The plan form – whilst responding to a generic ‘BCO’ standard office shape (1.5M space-planning module; maximum 18M deep wings; 2.8M headroom; fairly conventional servicing distribution) - also derives from the functional and operational requirements established by the client’s brief. A tiered series of building wings unified by the enclosed three-storey circulation and break-out space facing on to the approach road emerged as the optimum plan solution that synthesised the client’s requirements.

All the logistics facilities – medical equipment centre, sterilising plants and technical workshops - are at ground floor for ease of access and movement, with a mixture of cellular and open-plan offices, meeting rooms, conference rooms, restaurant and a gym on the upper floors.The main approach elevation is expressed as a transparent ‘showcase’ screen, unifying the space and functions behind whilst allowing visual access into the building and expressing Stryker’s corporate intentions.

ESA’s brief included the design of the interiors and the selection of all the furniture and fittings – a full ‘Cat A and Cat B’ service. A detailed analysis of Stryker’s work methods and workplace requirements preceded the developing concept. For many years now Stryker has consistently been at the top of various “best employer” league tables and this is reflected in the attention the company pays to the staff working environment and welfare facilities within the new building. ESA has risen to this challenge by providing comfortable offices and exhilarating common areas including reception, the exhibition areas and break-out spaces.

The building is aiming to achieve an “Excellent” BREEAM rating and incorporates alternative energy systems such as a biomass boiler to reduce carbon emissions.

Externally the new building sits within its own landscaped grounds with parking for 230 cars and rear servicing to the logistics areas.

ESA were originally appointed in 2008 to develop design proposals and, ultimately, gain planning consent.  They were appointed as architects, interior designers / space planners and landscape architects. Work commenced on site in July 2010 and has just been completed (August 2011). The client will move in this summer.