Delhi Regional Rapid Transit System

The facts

Client:   Delhi Integrated Multi Modal Transit System Ltd (DIMTS)
Location:   Delhi, India
Services:   Propose Route Alignment; Conceptual Station Design; Urban Station Design; Typical Viaduct Design, Environmental and Social Impact Assessments, System Design and Specifications; Cost Estimation, Construction Methodology
Sector:   Transport
Start/Completion:   2010 - 2012

The project

Capita Symonds is preparing a Detailed Project Report (DPR) for the 110km Delhi-Sonipat-Panipat ‘corridor’, part of a proposed Regional Rapid Transit System (RRTS) for the National Capital Region (NCR) which consists of eight corridors.

The majority of the alignment (100km) is on concrete viaduct consisting of standard 30m spans raised on piers before the final 3km goes through twin single bore tunnels into Kashmere Gate.

NCR is a highly urbanised region spread over four constituent states of Haryana, NCT-Delhi, Rajasthan and Uttar Pradesh. As its population is expected to grow to 64.14 million by 2021 an efficient transport system is vital in order to facilitate the region’s development.

Capita Symonds’ scope of work includes an alignment report which comprises a review of corridor characteristics; identifying and reviewing possible alignment options through each section of the corridor; and identifying land parcels and station locations.

In mid October 2011 Capita Symonds issued a feasibility report which included undertaking conceptual station planning; urban design of stations; topographic surveys; geo-technical investigations; typical design of proposed viaduct; design parameters and outline specifications of rolling stock; train operation plan; timetabling; traction system; power supply arrangement; signalling and telecommunication systems; and cost estimation.. This submission was included in the overall feasibility report prepared by Capita Symonds’ client DIMTS and issued to the National Capital Region Planning Board (NCRPB) at the end of October.

Once the feasibility report has been accepted by the NCRPB the final element of the work will be the Detailed Project Report (DPR) deliverables which include a construction methodology and commissioning schedule; environmental and social impact assessments; the resettlement and rehabilitation plan; facilities development plan; operation and maintenance plan; depot plans; and other technical assistance to the client.